We have just received confirmation that there will be some traffic disruption due to road work during the week of 7 to 11 April 2025, as Luxembourg’s schools will be on holiday.
- Bertrange 2 line will be heavily affected by the work being carried out in the centre of Bertrange.
- Bertrange 1 line will not be affected.
CHANGES TO BERTRANGE 2 LINE from 7 to 11/04/2025
From Bertrange to Lux2 (morning)
- Gemeng platform 3 stop will be moved to the Gemeng 2 stop (see blue dots on the map below).
- Rue de Mamer Wenkel stop will not be served and will be replaced by a temporary stop on the other side of the railway line, rue du Chemin de Fer, located next to the large electricity transformer (see yellow dots on the map below).
From Lux2 to Bertrange (afternoon)
- Rue de Mamer Wenkel stop will not be served and will be replaced by a temporary stop on the other side of the railway line: rue de Mamer in front of house No. 57 (see yellow dots on the map).
- Gemeng platform 3 stop will be moved toGemeng 1 stop.
Concerned families are requested to inform their children of all above changes for the Bertrange 2 bus route during the week starting on 07/04, as the bus will pass over the bridge above Bertrange station instead of through Bertrange town centre.
Thank you for your understanding.